Back to Operations
Operations
Education & Training
Updated March 2026

Education & Training Daily Opening Procedure

A structured procedure for opening the business each day, covering security checks, system startups, environment preparation, and team readiness verification.

Purpose

To ensure every business day begins consistently, safely, and efficiently so that staff and learners experience a reliable, professional environment from the moment doors open.

Scope

Covers all activities from the arrival of the first staff member through to the official opening time. Does not cover mid-day operational procedures or shift-specific tasks beyond the opening period.

Prerequisites

  • Access credentials and keys for the premises
  • Knowledge of alarm and security system operation
  • Up-to-date opening checklist printed or accessible digitally
  • Contact details for maintenance and emergency services
Compliance Note

Supports compliance with the ESOS framework, CRICOS requirements, ASQA standards, and state education department reporting.

Step-by-Step Procedure

1

Arrive and Secure Entry

The designated opener arrives at the premises at the scheduled time, disarms the security system, and performs an initial visual sweep of the exterior for any signs of damage, break-in, or hazards.

  • 1.1Arrive at least 30 minutes before the official opening time
  • 1.2Disarm the alarm system using the assigned code
  • 1.3Walk the exterior perimeter checking for damage, graffiti, or obstructions
  • 1.4Unlock the main entrance and staff entry points
Opening Manager
5-10 minutes
Security System, Key Management System
Tips
  • If the alarm has been triggered overnight, do not enter alone — contact security services first
  • Log your arrival time in the attendance system immediately
2

Conduct Interior Safety Walk

Perform a systematic walk-through of the entire interior to verify that no hazards exist, no unauthorized persons are present, and all areas are in acceptable condition.

  • 2.1Check all rooms, storage areas, and restrooms for safety hazards
  • 2.2Verify fire exits are unobstructed and emergency lighting is functional
  • 2.3Confirm no water leaks, unusual odors, or structural issues are present
Opening Manager
5-10 minutes
Tips
  • Use a flashlight if lighting systems have not yet been activated
  • Report any findings immediately in the incident log
3

Activate Building Systems

Power on all essential building systems including lighting, heating or cooling, ventilation, and background music or displays as applicable.

  • 3.1Turn on main lighting circuits for all operational areas
  • 3.2Set heating, ventilation, and air conditioning to the appropriate settings
  • 3.3Activate signage, display screens, and any audio systems
  • 3.4Verify internet connectivity and network systems are online
Opening Manager
5 minutes
Building Management System, Network Monitoring Tool
4

Start Up Operational Technology

Boot all computers, point-of-sale systems, printers, and any specialist equipment required for the day. Verify that each system is functioning correctly.

  • 4.1Power on all workstations and allow them to complete startup
  • 4.2Log in to the point-of-sale or booking system and verify connectivity
  • 4.3Test printers, scanners, and payment terminals
Opening Manager
5-10 minutes
Point-of-Sale System, Booking System
Tips
  • If any system fails to start, follow the IT escalation procedure before opening
5

Review Daily Schedule and Priorities

Check the daily calendar for appointments, deliveries, special events, or staffing changes. Identify any high-priority items that need attention during the day.

  • 5.1Open the scheduling system and review all bookings for the day
  • 5.2Check email and the Communication Tool for overnight messages or updates
  • 5.3Note any VIP visits, inspections, or deadlines
Opening Manager
5 minutes
Scheduling System, Communication Tool
6

Prepare the Learner-Facing Environment

Ensure all learner-facing areas are clean, well-stocked, and presentable. This includes waiting areas, service counters, course displays, and restrooms.

  • 6.1Wipe down counters, tables, and high-touch surfaces
  • 6.2Restock consumables such as brochures, forms, or course samples
  • 6.3Arrange furniture and displays to the standard layout
  • 6.4Verify restrooms are clean and fully supplied
Operations Team
10-15 minutes
Tips
  • Refer to the brand standards guide for display and layout requirements
7

Verify Cash and Financial Readiness

Count and confirm the opening cash float, ensure payment terminals are operational, and reconcile any discrepancies from the previous day if not already addressed.

  • 7.1Count the cash float and verify it matches the expected amount
  • 7.2Record the opening float in the daily financial log
  • 7.3Test at least one enrolment on each payment terminal
Opening Manager
5-10 minutes
Point-of-Sale System, Spreadsheet
Tips
  • Never leave the cash float unattended during counting
  • Report any discrepancies to the finance team before opening
8

Brief the Team

Conduct a brief stand-up class with all staff on shift to communicate the day's priorities, any schedule changes, safety reminders, and motivational updates.

  • 8.1Share the daily schedule highlights and any special instructions
  • 8.2Assign specific tasks or zones to each team member
  • 8.3Remind the team of any ongoing promotions, events, or policy changes
Opening Manager
5-10 minutes
Tips
  • Keep the briefing to under 10 minutes to maintain energy and focus
9

Complete the Opening Checklist

Walk through the formal opening checklist to confirm every item has been addressed. Sign off and store the completed checklist for audit purposes.

  • 9.1Review each item on the opening checklist and tick off completed tasks
  • 9.2Note any exceptions or issues in the comments section
  • 9.3Sign and date the checklist
Opening Manager
3-5 minutes
Checklist Tool, Document Management System
10

Open for Business

Unlock learner entrances, activate the open sign, and confirm that all staff are at their assigned positions ready to serve.

  • 10.1Unlock all learner-facing entrances at the official opening time
  • 10.2Turn on the open sign and update online status if applicable
  • 10.3Confirm all team members are in position and ready
Opening Manager
2 minutes

Quality Checkpoints

Security system properly disarmed and entry logged
All technology systems booted and verified functional
Cash float counted and recorded accurately
Opening checklist completed, signed, and filed

Common Mistakes to Avoid

Skipping the exterior perimeter check, missing potential hazards
Failing to test payment terminals before the first learner arrives
Not reviewing overnight messages, leading to missed urgent updates
Rushing the team briefing or skipping it entirely on busy days

Expected Outcomes

On-Time Opening Rate

Percentage of days the business opens at or before the scheduled time, targeting 99% or higher.

Opening Checklist Compliance

Percentage of opening checklists completed fully and filed, targeting 100% compliance.

System Downtime at Open

Number of days where a technology failure delayed opening, targeting zero incidents per quarter.

Frequently Asked Questions

Who is responsible if the usual opener is absent?

The roster should designate a backup opener at least one day in advance. If no backup is available, the duty manager must be contacted at least one hour before the scheduled opening time.

Can the opening procedure be shortened on quiet days?

No. The opening procedure must be followed in full every day regardless of expected volume. Consistency ensures safety, compliance, and operational readiness.

How do I handle a cash float discrepancy?

Record the discrepancy in the daily financial log, note the exact difference, and report it to the finance team immediately. Do not adjust the float yourself — await instructions before proceeding.

What should I do if the alarm is already triggered when I arrive?

Do not enter the premises. Move to a safe distance, contact the security monitoring company, and call emergency services if advised. Only enter once the premises have been cleared by an authorized party.

Want this customised for YOUR business?

We'll tailor every step to your exact operations, tools, and team structure.